PRIMETEST 50Operating InstructionsPRIMETEST250+Operating InstructionsPRIMETEST
PrimeTest 250+Operating Instructions8Standard AccessoriesOptional AccessoriesPart Number403A91071G082305A950300A002396A972403A759403A556Seaward PrimeT
PrimeTest 250+Operating Instructions9Figure 1. PrimeTest 250+ Front View111210
PrimeTest 250+Operating Instructions1014151613Figure 2. PrimeTest 250+ End ViewFigure 3. Testing CLI appliances, no mains leakage
PrimeTest 250+Operating Instructions11Figure 4. Testing CLII appliances, no mains leakage
PrimeTest 250+Operating Instructions12Figure 5. Testing CLI appliances, mains leakage
PrimeTest 250+Operating Instructions13Figure 6. Testing CLII appliances, mains leakage
PrimeTest 250+Operating Instructions14Figure 7. Testing IEC Leads
PrimeTest 250+Operating Instructions15Figure 8. Testing Installation RCD
PrimeTest 250+Operating Instructions16Figure 9. Testing Plug Top RCD
PrimeTest 250+Operating Instructions172 IntroductionThe PrimeTest 250+ is a hand held battery powered unit suitable for carrying out electrical safety
PrimeTest 250+Operating Instructions18Power ON/OFF = press and hold CLI and CLII simultaneouslyClass I appliance test = press the CLI keyClass II appl
3 Performing TestsPress CLI and CLII keys simultaneously to switch on the PrimeTest 250+. When the unit is ready the display will be as shown below.
PrimeTest 250+Operating Instructions20After 2s the display will return to the start up screen.If the mains voltage is incorrect then the PrimeTest 250
• If the measured value is less than the factory set pass/fail threshold, the measured value is displayed and the unit indicates a pass result, as
PrimeTest 250+Operating Instructions22• Check that the appliance power switch is in the ON position. The test will automatically proceed if the app
• If a differential leakage test is performed then the test PrimeTest 250+ will prompt the user to start the Leakage test by fl ashing the Ileak
PrimeTest 250+Operating Instructions24• If the Differential Leakage is less than the factory set limit a tick is placed next to the Ileak enunciato
PrimeTest 250+Operating Instructions25Note: The power switch on the appliance under test must be in the ON position to perform an insulation te
PrimeTest 250+Operating Instructions26• Check that the appliance power switch is in the ON position. The test will automatically proceed if the app
• If a touch leakage test is performed then the PrimeTest 250+ will prompt the user to start the Leakage test by fl ashing the Ileak icon. If no k
Part Number 403A556 Revision 2© 2014 Seaward Electronic LtdPrimeTest 250+Operating Instructions1Operating InstructionsPRIMETEST250+Bracken HillSouth
PrimeTest 250+Operating Instructions283.4 Testing a mains cord• Visually inspect the mains cord and plug for signs of damage.• Check that the corr
PrimeTest 250+Operating Instructions29Note: If the tested cord has a wiring fault, one of the following enunciators will be illuminated in place of GO
PrimeTest 250+Operating Instructions303.6 Changing the Insulation Test VoltageThe Insulation test performed in the CLI and CLII test sequences can be
3.8 Performing an RCD test on an installation RCD When performing an RCD test ensure that the Continuity Test probe is disconnected from the
Whenever reSet is displayed on the LCD press the reset button on the RCD.The PrimeTest 250+ will perform a IΔn (30mA) 0° test, the operating time of
PrimeTest 250+Operating Instructions33Mains statusNo mainsEarth faultLN LE NEFlash Flash OFFOFF Flash FlashWhenever reSet is displayed on the LCD pres
PrimeTest 250+Operating Instructions34• Otherwise, the PrimeTest 250+ will proceed with the RPE measurement, reverse the test current and then repea
PrimeTest 250+Operating Instructions354 Memory & Print FunctionsThe PrimeTest 250+ can store the results for a maximum of 999 appliances.4.1 Sav
PrimeTest 250+Operating Instructions364.4 Transferring Test ResultsTest data can be transferred to a PC using the Datalogger on the provided PT250+ S
PrimeTest 250+Operating Instructions374.6 Setting the Real Time ClockSetting time and date: Ensure that the PrimeTest 250+ is powered off. Press and
PrimeTest 250+Operating Instructions2Limited Warranty & Limitation of LiabilitySEAWARD Electronic Limited guarantees this product to be free from
PrimeTest 250+Operating Instructions385 Specifi cationEarth Continuity Display Range 0.01ohms to 19.99ohms Measuring Range 0.05ohms to 19.99ohms A
PrimeTest 250+Operating Instructions39EarthContinuityInsulation ResistanceLeakageClass IClass IICord3-Phase0.2 ohmsn/a0.2 ohms0.2 ohms1.0Mohm2.0Mohm1.
PrimeTest 250+Operating Instructions406 MaintenanceClean only with a dry cloth; do not use solvents.Before use, ensure unit is clean and dry; visually
PrimeTest 250+Operating Instructions417.1 Battery Replacement Before opening the PrimeTest 250+ ensure that all test leads are disconnected. • S
PrimeTest 250+Operating Instructions42Part Number27B114Replacement F16A 250V Fuse 8 Fuse Replacement Before opening the PrimeTest 250+ ensure th
PrimeTest 250+Operating Instructions439 Service and CalibrationTo maintain the specifi ed accuracy of the measurement results, the instrument must be
PrimeTest 250+Operating Instructions44
PRIMETEST 50Operating InstructionsPRIMETEST250+Operating InstructionsPRIMETEST
PrimeTest 250+Operating Instructions3Disposal of old productThis product has been designed and manufactured with high quality materials and components
DECLARATION OF CONFORMITYAs the manufacturer of the apparatus listed, declare under our sole responsibility that the product:SEAWARD PrimeTest 250+To
PrimeTest 250+Operating Instructions5Contents1 Important Information ... 62 Introduction ...
1 Important InformationThese operating instructions are intended for the use of adequately trained personnel.The following symbols are used in these o
The PrimeTest 250+ may apply high voltage or mains power to the appliance under test. Do not touch conductive parts of the appliance while tests
Commenti su questo manuale