Seaward Apollo 500 Manuale Utente

Navigare online o scaricare Manuale Utente per Apparecchiature Seaward Apollo 500. Seaward Apollo 500 User Manual Manuale Utente

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 21
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 0
Apollo 500
Table of Contents
1. Limited Warranty & Limitation of Liability
2. Disposal of old product
3. Certificate of Conformity
4. User Notes
5. Safety Notes
6. Accessories
6.1 Standard accessories
6.2 Optional Accessories
7. Introduction to the Apollo 500
7.1 Front diagram
7.2 Top Diagram
7.3 Back diagram
8. Getting Started
8.1 Charging New Batteries
8.2 Power On
9. User Interface Navigation
9.1 Screen Layout
9.2 Menu Navigation
9.3 Battery Status
9.4 Test Functionality
10. Main Menu
10.1 View Saved Data
10.2 User Options
10.3 Bluetooth Setup
10.4 Automatic Test Sequence Editor (PAT Edit)
10.5 Download
10.5.1 Downloading into PATGuard 3
10.6 Upload
10.6.1 Uploading from PATGuard 3
10.6.2 Uploading a Logo for TnT Labels
10.7 Set Date and Time
10.8 Memory
11. Portable Appliance Testing
11.1 Automatic Test Sequence
11.1.1 Entering Asset Details
11.1.2 Using the Risk Based Retest Period Calculator
11.1.3 The Formal Visual Inspection
11.2 Manual Test Interface
11.3 Test Functions
Earth Continuity
Nulling out Test Leads
Insulation Resistance
Substitute Leakage
Protective Earth (PE) Conductor Current
Touch Current
RCD Trip Time
IEC Lead / Polarity
External Leakage Adaptors
11.4 Checkbox Verification
11.5 PAT Settings
12. Universal Risk Assessment
13. Health & Safety Reports
14. Updating your Firmware
15. Electrical Specification
16. Useful Information
16.1 Factory Set Test Sequences
16.2 Other Information
Vedere la pagina 0
1 2 3 4 5 6 ... 20 21

Sommario

Pagina 1 - Apollo 500

Apollo 500Table of Contents 1. Limited Warranty & Limitation of Liability2. Disposal of old product 3. Certificate of Conformity4. User Notes5. Sa

Pagina 2

Bluetooth Setup), or set to automaticallyincrement (see 11.4 PAT Settings).Test Sequence This is the name of the pre-defined testsequence

Pagina 3 - 6. Accessories

This is the Change Format function. This will change theformat of the label 11.2 Manual Test Interface The Apollo 500 allows direct access

Pagina 4 - 8. Getting Started

IEC ContinuityThe test is performed between the EUTtest socket and the IEC test socket. Always ensure that you have selected the appropriatete

Pagina 5 - 9. User Interface Navigation

The test is performed between the EUTtest socket live and neutral and Red testterminal.Point to Point InsulationThe test is performed betwe

Pagina 6 - 10. Main Menu

In manual mode once the correct connections have been made for the selected test type press the Start button, in automatic mode the test will proc

Pagina 7 - 10.3 Bluetooth Setup

plugged into the EUT test socket and aconnection should be made from the RCDmains output to the IEC test socket.Once the correct connections ha

Pagina 8 - 10.5 Download

On TestFailure In the event of a test failure during an automaticsequence, the Apollo 500 can be configured to eitherEnd Test, which will terminate th

Pagina 9 - 10.7 Set Date and Time

CommentsLine This allows the field descriptor for each of the fourcomment lines to be changed to show Notes, AssetDescription, Asset Group, Make, Mod

Pagina 10

Touch CurrentTest Voltage: Display Range: Measurement Range: Resolution: Operating Error: Frequency R

Pagina 11 - 11.3 Test Functions

13A 25m Ext Lead 30mA RCD Yes 5 0.5 5 0.8 30Portable CLI PE Current Yes 5 0.5 2 250 1 5 0.8 Portable CLII Touch Current Yes

Pagina 12 - Insulation Resistance

17. Environmental Conditions18. Maintenance18.1 Charging the battery pack.18.2 Securing the Apollo 50018.3 Cleaning the Apollo 50018.4 Replacing the b

Pagina 13 - Substitute Leakage

Operating Altitude 0 to 2000 metres.16. Maintenance16.1 Charging the battery pack.The battery pack will be charged whenever the Apollo 500 is connecte

Pagina 14 - RCD Trip Time

Tel: (+44) 191 5878739 (+44) 191 5878737 Email: [email protected] House is part of the Seaward Group. 19.1 Register your produc

Pagina 15 - 11.4 Checkbox Verification

The following symbols are used in these operating instructions and on the Apollo 500. Warning of electrical danger!Indicates instructions must be foll

Pagina 16

Test lead, red, 1.2m 1Alligator clip, red 1IEC test lead 1USB Download Lead 1Apollo Series Check Box 1 6.2 Optional AccessoriesTest n Tag Elite Blueto

Pagina 17 - 13. Electrical Specification

9. User Interface Navigation9.1 Screen Layout1. Information bar2. Function key icons3. Test interface sequence table4. Test interface details5. Main a

Pagina 18 - 14. Useful Information

This symbol indicates that the batteries are discharged.The Apollo 500 will switch itself off after a short period oftime.This symbol indicates

Pagina 19 - 15. Environmental Conditions

by selecting ‘change password’ and entering the oldpassword and entering a new one then confirming it. This User Privileges menu allows users to view

Pagina 20 - 17. Support

When editing a test sequence the following functions are availableThis is the Add Test function. This will add a new testdirectly under the

Pagina 21

There may be other software products that support limited download from Apollo. Please contact your software provider with regards to compatibility an

Commenti su questo manuale

Nessun commento